The word “apartheid” appeared 1 times in this article's opening at its peak in 2020. Today the opening carries none, and neither does the rest of the article, references included.
Measured, not asserted. Every count, date and revision on this page was taken from Wikipedia's own history and checked against the live article. The words quoted are theirs.
Machine-checked against the full current article on 2026-08-02. “apartheid” appeared 1 times in this article's opening at its peak. Today it appears nowhere in the article, references included.
We saved snapshots of this article over twenty years; you are reading the 2020 one. Red dashes: removed from Wikipedia since.Pale dots: rewritten; the numbered note shows what it says now.Red text: written in or rewritten since the previous snapshot.1 tap a number or a side note to jump between them
The opening as it read in 2020
Jerusalem, Israel.1The Jerusalem Light Rail ( , HaRakevet HaKala Birushalayim ) is a light rail system in Jerusalem , Israel .2 Currently, the Red Line is the only one in operation, the first of several light rail lines planned in Jerusalem . Construction on the Red line began in 2002 and ended in 2010, when the testing phase began. It was built by the CityPass consortium, which has a 30-year concession to operate it. The project required construction of the Jerusalem Chords Bridge as well as other renovation projects around Jerusalem. After repeated delays due to archaeological discoveries and technical issues, service began, initially free of charge, on August 19, 2011. It became fully operational on December 1, 2011. The line is 13.9 kilometers (8.6 mi) long with 23 stops.3Extensions to the red line are currently under construction to the Israeli settlement of Neve Yaakov and to Hadassah Ein Kerem Hospital to the southwest.4When completed in 2021, these will extend the line's length to 22.5 km.5 With a total estimated cost for the Red Line's initial section of ₪ 3.8 billion (approx. US $1.1 billion), the project was criticized for budget overruns , for its route serving Jewish settlements in East Jerusalem and for contributing to air and noise pollution during construction. The Green line's plans have been approved by the city of Jerusalem, with right-of-way clearing works underway. Construction tenders, including those for the red line extension, were awarded in August 2019 to TransJerusalem J-Net Ltd., owned by CAF and Shapir Engineering. The approval process on the Blue line has started.
This is Wikipedia's own text, saved in our repository. Their copy of it is revision 963448777.
The opening as it stood in 2010
The Jerusalem Light Rail project consists of one, and at a later stage, multiple light rail and BRT lines to provide rapid transit in Jerusalem .
Red text was written in or rewritten since the previous snapshot. Their copy is revision 369542231.
The opening as it stood in 2015 1 passage from the previous snapshot no longer appear
The Jerusalem Light Rail ( , HaRakevet HaKala Birushalayim ) is a light rail line, the first of several rapid transit lines planned in Jerusalem .Construction began in 2002 and ended in 2010, when the testing phase began.It was built by the CityPass consortium, which has a 30-year concession to operate it.The project required construction of the Jerusalem Chords Bridge as well as other renovation projects around Jerusalem.After repeated delays due to archaeological discoveries and technical issues, service began, initially free of charge, on August 19, 2011.It became fully operational on December 1, 2011.The line is 13.9 kilometers (8.6 mi) long with 23 stops.Extensions are currently under construction to the northern suburb of Neve Yaakov and to Hadassah Ein Kerem Hospital to the southwest.When completed in 2016, these will extend the line's length to 22.5 km.With a total estimated cost for the initial line of 3.8 billion NIS (approx.US $1.1 billion), the project was criticized for budget overruns , for its route serving the settlements of East Jerusalem and for contributing to air and noise pollution during construction."Extending Light Rail to Hadassa Ein Kerem" (Press release) (in Hebrew).
Red text was written in or rewritten since the previous snapshot. Their copy is revision 669400106.
The opening as it stood on October 6, 2023
Light rail system in Jerusalem, Israel "CityPass" redirects here.The Jerusalem Light Rail ( , HaRakevet HaKala Birushalayim , , Qiṭār Al-Quds Al-Khafīf ) is a light rail system in Jerusalem . Currently, the Red Line is the only one in operation, the first of several light rail lines planned in Jerusalem . Construction on the Red line began in 2002 and ended in 2010, when the testing phase began. It was built by the CityPass consortium, which has a 30-year concession to operate it. The project required construction of the Jerusalem Chords Bridge as well as other renovation projects around Jerusalem. After repeated delays due to archaeological discoveries and technical issues, service began, initially free of charge, on August 19, 2011. It became fully operational on December 1, 2011. The line is 13.9 kilometers (8.6 mi) long with 23 stops. Extensions to the red line are currently under construction to the Israeli settlement of Neve Yaakov and to Hadassah Ein Kerem Hospital to the southwest. When completed in 2021, these will extend the line's length to 22.5 km (14.0 mi). With a total estimated cost for the Red Line's initial section of ₪ 3.8 billion (approx. US $1.1 billion), the project was criticized for budget overruns , for its route serving Jewish settlements in East Jerusalem and for contributing to air and noise pollution during construction. The Green line's plans have been approved by the city of Jerusalem, with right-of-way clearing works underway. Construction tenders, including those for the red line extension, were awarded in August 2019 to TransJerusalem J-Net Ltd., owned by CAF and Shapir Engineering. The approval process on the Blue line has started. Jerusalem by rail: What’s the latest on the capital’s light rail lines?
Red text was written in or rewritten since the previous snapshot. Their copy is revision 1174879755.
The opening as it stood in 2025 3 passages from the previous snapshot no longer appear
Light rail system in Jerusalem "CityPass" redirects here.The Jerusalem Light Rail ( Hebrew : הרכבת הקלה בירושלים , HaRakevet HaKala Birushalayim , Arabic : قطار القدس الخفيف , Qiṭār Al-Quds Al-Khafīf ) is a light rail system in Jerusalem . Currently, the Red Line is the only one in operation, the first of several light rail lines planned in Jerusalem . Construction on the Red line began in 2002 and ended in 2010, when the testing phase began. It was built by the CityPass consortium, which has a 30-year concession to operate it. The project required construction of the Jerusalem Chords Bridge as well as other renovation projects around Jerusalem. After repeated delays due to archaeological discoveries and technical issues, service began, initially free of charge, on August 19, 2011. It became fully operational on December 1, 2011. The line is 22.5 kilometers (14.0 mi) long with 35 stops.The last extensions to the red line were opened in February 2025 to the Israeli settlement of Neve Yaakov and to Hadassah Ein Kerem Hospital to the southwest. With a total estimated cost for the Red Line's initial section of ₪ 3.8 billion (approx. US $1.1 billion), the project was criticized for budget overruns , for its route serving Jewish settlements in East Jerusalem and for contributing to air and noise pollution during construction. The Green line's plans have been approved by the city of Jerusalem, with right-of-way clearing works underway. Construction tenders, including those for the red line extension, were awarded in August 2019 to TransJerusalem J-Net Ltd., owned by CAF and Shapir Engineering. The approval process on the Blue line has started. Jerusalem by rail: What’s the latest on the capital’s light rail lines?
Red text was written in or rewritten since the previous snapshot. Their copy is revision 1287957905. This is our newest snapshot; the live article may have moved again since.
Today
“apartheid” appeared 1 times in this article's opening at its peak. Today it appears nowhere in the article, references included. Read the current article and compare.
2010
2015
2020
Oct '23
2025
apartheid
0
0
1
1
0
Counts in the opening at each snapshot. Green: the word gained ground. Red: it was cut. Grey: no change.
Sections that no longer exist
Present on 6 October 2023, absent today. A heading can vanish because the section was deleted or because it was renamed or merged, and we have not separated those here, so treat this as a list of what to check rather than a verdict.
July 2014 riots511 characters
Struck red text is no longer in the article; dotted amber text was rewritten. Every revision id links to Wikipedia's copy; the text shown is our own saved copy. Data: /data. Wikipedia text is CC BY-SA; quoted for the record; not affiliated with Wikipedia.