Wikipedia's first sentence called it “designation of a combination of existing roads and new construction creating a continuous route between jerusal”. Today it says “combination of existing roads and new construction creating a continuous route between jerusalem 's highway 50”. Wikipedia's first sentence called it “designation of a combination of existing roads and new construction creating a continuous route between jerusal”. Today it says “combination of existing roads and new construction creating a continuous route between jerusalem 's highway 50”.
Measured, not asserted. Every count, date and revision on this page was taken from Wikipedia's own history and checked against the live article. The words quoted are theirs.
Machine-checked against the full current article on 2026-08-03.
We saved snapshots of this article over twenty years; you are reading the 2025 one. Red dashes: removed from Wikipedia since.Pale dots: rewritten; the numbered note shows what it says now.Red text: written in or rewritten since the previous snapshot.1 tap a number or a side note to jump between them
The opening as it read in 2025
Road in Israel ‹ The template Infobox street is being considered for merging . › The boulevard in the center is Abdel Hamid Shoman Street, part of Jerusalem Road 20. Around it parts of Beit Hanina Benzion Netanyahu Interchange Jerusalem Road 20 is a combination of existing roads and new construction creating a continuous route between Jerusalem 's Highway 50 (Begin Boulevard) and Pisgat Ze'ev via Beit Hanina . The number "20" is a designation used by the Jerusalem Municipality. Several segments of the road follow national road 4197. The cost of the project was NIS 180 million and was completed on 5 May 2013.
This is Wikipedia's own text, saved in our repository. Their copy of it is revision 1275310574.
The opening as it stood in 2015
Jerusalem Road 20 , is the designation of a combination of existing roads and new construction creating a continuous route between Jerusalem 's Highway 50 (Begin Boulevard) and Pisgat Ze'ev via Beit Hanina . The number "20" is a designation used by the Jerusalem Municipality. Several segments of the road follow national road 4197. The cost of the project was NIS 180 million and was completed on 5 May 2013.
Red text was written in or rewritten since the previous snapshot. Their copy is revision 632046963.
The opening as it stood in 2020
Jerusalem Road 20 is a combination of existing roads and new construction creating a continuous route between Jerusalem 's Highway 50 (Begin Boulevard) and Pisgat Ze'ev via Beit Hanina . The number "20" is a designation used by the Jerusalem Municipality. Several segments of the road follow national road 4197. The cost of the project was NIS 180 million and was completed on 5 May 2013.
Red text was written in or rewritten since the previous snapshot. Their copy is revision 964451156.
The opening as it stood on October 6, 2023
‹ The template Infobox street is being considered for merging . › The boulevard in the center is Abdel Hamid Shoman Street, part of Jerusalem Road 20.Around it parts of Beit Hanina Benzion Netanyahu Interchange Jerusalem Road 20 is a combination of existing roads and new construction creating a continuous route between Jerusalem 's Highway 50 (Begin Boulevard) and Pisgat Ze'ev via Beit Hanina . The number "20" is a designation used by the Jerusalem Municipality. Several segments of the road follow national road 4197. The cost of the project was NIS 180 million and was completed on 5 May 2013.
Red text was written in or rewritten since the previous snapshot. Their copy is revision 1171421737.
Today
Wikipedia's first sentence called it “designation of a combination of existing roads and new construction creating a continuous route between jerusal”. Today it says “combination of existing roads and new construction creating a continuous route between jerusalem 's highway 50”. Wikipedia's first sentence called it “designation of a combination of existing roads and new construction creating a continuous route between jerusal”. Today it says “combination of existing roads and new construction creating a continuous route between jerusalem 's highway 50”. Read the current article and compare.
2015
2020
Oct '23
2025
Counts in the opening at each snapshot. Green: the word gained ground. Red: it was cut. Grey: no change.
What Wikipedia says this is
Every article opens by defining its subject. This one was redefined since 2015, and today's defining sentence is their current revision.
Then
designation of a combination of existing roads and new construction creating a continuous route between jerusal
Now
combination of existing roads and new construction creating a continuous route between jerusalem 's highway 50
Struck red text is no longer in the article; dotted amber text was rewritten. Every revision id links to Wikipedia's copy; the text shown is our own saved copy. Data: /data. Wikipedia text is CC BY-SA; quoted for the record; not affiliated with Wikipedia.